Case Study: Stevens Construction
SITE: NEW TRAINING FACILITY, WILMOTT DIXON, CRAWLEY
CONTRACT DATE: JAN 2018 – ONGOING
UK Membranes supplied and installed Visqueen Ultimate and Visqueen Blue Gas membrane to this 5500m2 site as outlined in the scope of works including validation and integrity testing.