Case Study: MV Kelly
SITE: HOUSING, HATFIELD
CONTRACT DATE: 2016
UK Membranes supplied and installed Juta GP1 gas membrane for a block of flats and 200 homes including validation and integrity testing. The company supplied labour, plant, small tools, and the materials to complete the gas membrane works as detailed on the specification, drawings, and as outlined in the scope of works.